Semiconductor device and related method of adjusting threshold voltage in semiconductor device during manufacture via counter doping in diffusion region

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10818655
APP PUB NO 20160233216A1
SERIAL NO

15023049

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a substrate (110); a buried layer (120) formed on the substrate (110), a diffusion layer (130) formed on the buried layer (120), wherein the diffusion layer (130) includes a first diffusion region (132) and a second diffusion region (134), and an impurity type of the second diffusion region (134) is opposite to an impurity type of the first diffusion region (132); the diffusion layer (134) further comprises a plurality of third diffusion regions (136) formed in the second diffusion region, wherein an impurity type of the third diffusion region (136) is opposite to the impurity type of the second diffusion region (134); and a gate (144) formed on the diffusion layer (130).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CSMC TECHNOLOGIES FAB2 CO LTD214028 NO 8 XINZHOU ROAD NATIONAL HI TECH INDUSTRIAL DEVELOPMENT ZONE WUXI JIANGSU WUXI CITY JIANGSU PROVINCE 214028

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Guangsheng Wuxi New District, CN 56 982
Zhang, Sen Wuxi New District, CN 105 329

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00