Crossover valve system and method for gas production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10612350
APP PUB NO 20160230520A1
SERIAL NO

15022829

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A crossover valve assembly for insertion into production tubing, or integral with production tubing, includes an outer housing, an inner production tube, a pilot section responsive to external pressure to open an activation passage above a pre-determined pressure, a power section responsive to pressure in the activation passage to open an injection opening; and a crossover valve responsive to pressure in the injection opening to open a crossover port, allowing fluid communication from outside the outer housing to within the inner production tube. The crossover valve assembly may be used in a method of producing a vertical, deviated or horizontal gas well having an annular space defined by a well casing and a concentrically disposed production tubing, wherein an annulus exists above a packer isolating the annulus, includes the steps of (a) opening a communication path through the tubing into the annulus, and if necessary, removing any fluid in the annulus, (b) landing a crossover valve assembly within the production tubing above the packer and exposed to the annulus; and (c) injecting gas into the annular space to open the crossover valve and enter the production tubing, wherein the injected gas lifts liquids in the production tubing to the surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAISE PRODUCTION INCCALGARY ALBERTA T2C 1G5

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Laing, Eric Calgary, CA 12 29
Steele, Geoff Calgary, CA 21 118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 7, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00