Polymer composite strut insulator and suspension system for vehicle applying the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9522585
APP PUB NO 20160221409A1
SERIAL NO

14838824

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polymer composite strut insulator may include a polymer composite bracket made of polymer composite, divided into a mounting fastening portion having an inserter into which mounting bolts are press-inserted to penetrate and a bearing assembling portion, and provided with a central hole at a central portion, an elastic mass cross-linked to the polymer composite bracket in order for the cup hole surrounding the central hole formed at the central portion of the polymer composite bracket to be divided into an upper cup hole and a lower cup hole, the upper cup hole being coupled to an upper cup and the lower cup hole being coupled to a lower cup, and a bearing disposed at the bearing assembling portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797 06797
ILJIN CO LTDGYEONGJU-SI GYEONGSANGBUK-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jang, Jun-Ho Yongin-si, KR 38 493
Kang, Hyun-Min Seongnam-si, KR 3 39
Kim, Chang-Kyu Hwaseong-si, KR 26 116
Kwon, Tea-Sung Gyeongju-si, KR 1 5
Lee, Sung-Keun Seoul, KR 13 116
Lim, Dong-Gyu Gwacheon-si, KR 1 5
Yun, Deok-Woo Hwaseong-si, KR 1 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00