System and method for accelerating a mass using a pressure produced by a detonation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9581704
APP PUB NO 20160216387A1
SERIAL NO

15003525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention pertains to a system and method for accelerating a mass using a pressure produced by a detonation, where the mass is accelerated over a movement range using a detonation of a pressure wave generator that produces a pressure within a coupling component that is applied to a piston having a surface area that produces a resultant force, where the acceleration of the mass determines the resulting force. The resulting force may be directed vertically and perpendicular to a target media to conduct an acoustic wave into the target media. The system may be configured to direct the resulting force horizontally and parallel to a target media to conduct a plane shear wave into the target media. Two systems may be configured to direct two resulting forces horizontally and parallel to a target media to conduct a spherical shear wave into a target media, where the two resulting forces are directed in opposite directions and separated by some distance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOUNDBLAST TECHNOLOGIES LLCWINTER PARK FL 32789

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fullerton, Larry W New Hope, US 332 14265
Teel, James L Winter Park, US 7 71
Thompson,, Jr Herman M Kelso, US 4 137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 28, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00