Internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850807
SERIAL NO

14990104

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine including a pre-chamber connected to a pre-chamber feed conduit for supplying the pre-chamber with a fuel (F), and a main combustion chamber. Fuel (F) in the main combustion chamber can be ignited by an ignition flare which passes from the at least one pre-chamber into the at least one main combustion chamber and which is produced by ignition of fuel (F) in the pre-chamber. At least one valve can be open-loop or closed-loop controlled by an open-loop or closed-loop control device depending on a parameter characteristic of a change in a power produced by the internal combustion engine, and/or by which a pre-chamber fuel flow directed through the pre-chamber feed conduit to the at least one pre-chamber can be at least partially diverted into a volume separate from the at least one pre-chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INNIO JENBACHER GMBH & CO OG6200 JENBACH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Graus, Mario Mils, AT 2 7
Lopez, Francisco Innsbruck, AT 27 188
Schaumberger, Herbert Muenster, AT 27 100
Spyra, Nikolaus Innsbruck, AT 43 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00