Electrodeposition method for preparing polycrystalline copper having improved mechanical and physical properties

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10060016
APP PUB NO 20160208369A1
SERIAL NO

15003259

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Polycrystalline materials are prepared by electrodeposition of a precursor material that is subsequently heat-treated to induce at least a threefold increase in the grain size of the material to yield a relatively high fraction of ‘special’ low Σ grain boundaries and a randomized crystallographic texture. The precursor metallic material has sufficient purity and a fine-grained microstructure (e.g., an average grain size of 4 nm to 5 μm). The resulting metallic material is suited to the fabrication of articles requiring high mechanical or physical isotropy and/or resistance to grain boundary-mediated deformation or degradation mechanisms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEGRAN TECHNOLOGIES INC6300 NORTHAM DRIVE MISSISSAUGA L4V 1H7

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aust, Karl Toronto, CA 2 4
Brooks, Iain Toronto, CA 24 916
Gonzalez, Francisco Toronto, CA 57 1401
Lin, Peter Toronto, CA 64 1091
Nagarajan, Nandakumar Burlington, CA 15 395
Palumbo, Gino Toronto, CA 69 1767
Tomantschger, Klaus Mississauga, CA 97 2780

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00