Composite active material for lithium secondary batteries and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10749178
APP PUB NO 20160197345A1
SERIAL NO

14911826

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a production method for a composite active material for lithium secondary batteries which enables production of an electrode material in which volume expansion is suppressed even after repeated charging and discharging, and enables production of a lithium secondary battery exhibiting excellent cycle characteristics. A composite active material for lithium secondary batteries is produced using a mixing step of mixing graphite having a specific surface area of not less than 30 m2/g, silicon monoxide, and a carbon precursor to obtain a mixture; a conglobation step of performing conglobation treatment on the mixture and obtaining a spherical mixture; and a heating step of heat-treating the spherical mixture and producing a substantially spherical composite active material for lithium secondary batteries.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOSOH CORPORATIONSHUNAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tamaki, Ryo Kyoto, JP 30 245

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00