Hard coating film for cutting tools

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9855608
SERIAL NO

14915905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a hard coating film formed on a hard base material such as cemented carbide. The hard coating film has a nanoscale multilayered structure to have improved oxidation resistance and wear resistance. The hard coating film is a hard coating film formed on the base material. The first layer is composed of a TiAl nitride having a composition of Ti1-aAla (0.3≦a≦0.7), and the second layer has a nanoscale multilayered structure or a structure in which the nanoscale multilayered structure is repeatedly laminated at least two times, the nanoscale multilayered structure including a thin layer A composed of an AlTiSi nitride, a thin layer B, a thin layer C composed of a AlCr nitride, and a thin layer D having thicknesses of 3 nm to 20 nm. The thin film B and the thin film D are composed of a TiAl nitride.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KORLOY INCSEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Seoun-Yong Chungcheongbuk-do, KR 1 12
Ahn, Seung-Su Chungcheongbuk-do, KR 15 32
Kim, Young Heum Chungcheongbuk-do, KR 57 497
Lee, Sung-Gu Chungcheongbuk-do, KR 16 47
Park, Je-Hun Chungcheongbuk-do, KR 14 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00