Systems and methods of estimating a combustion equivalence ratio in a gas turbine with exhaust gas recirculation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9869247
SERIAL NO

14982733

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes an exhaust gas recirculation (EGR) gas turbine system which includes a combustor configured to receive and combust a fuel with an oxidant and a turbine driven by combustion products from the combustor and a turbine driven by combustion products from the combustor. The EGR gas turbine system further includes an exhaust gas recirculation section fluidly coupled to the turbine and to the combustor, wherein the exhaust gas recirculation section is configured to intake an exhaust gas from the turbine and to recirculate at least a portion of the exhaust gas to the combustor as a diluent. The EGR gas turbine system additionally includes a control system, comprising one or more processors configured to receive a first signal representative of an exhaust flow composition of the exhaust gas and to receive a second signal representative of a diluent flow composition of the diluent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Thatcher, Jonathan Carl Greenville, US 22 503
Vorel, Aaron Lavene Greenville, US 5 98

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00