METHOD OF SYNTHESIZING AXIAL POWER DISTRIBUTIONS OF NUCLEAR REACTOR CORE USING NEURAL NETWORK CIRCUIT AND IN-CORE PROTECTION SYSTEM (ICOPS) USING THE SAME
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jun 23, 2016
app pub date -
Sep 17, 2015
filing date -
Sep 17, 2015
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
There are provided a method of synthesizing axial power distributions of a nuclear reactor core using a neural network circuit and an in-core protection system (ICOPS) using the same, in which using the neural network circuit including an input layer, an output layer, and at least one hidden layer, each layer being configured with at least one node, each node of one layer being connected to nodes of the other layers, node-to-node connections being made with connection weights varied based on a learning result, optimum connection weights between the respective nodes constituting the neural network circuit are determined through learning based on various core design data applied to the design of a nuclear reactor core of a nuclear power plant, and axial power distributions of the nuclear reactor core are synthesized based on ex-core flux detector signals measured by ex-core neutron flux detectors during operation of a nuclear reactor, so that the initial time required to perform a start-up test of the nuclear reactor can be reduced since basic data for synthesizing axial power distributions need not be separately measured in the start-up test of the nuclear reactor contrary to a conventional ICOPS, thereby improving the economic efficiency of the nuclear power plant, and so that overall nuclear reactor core design data can be used rather than actual measurement data in the start-up test (i.e., at the beginning of a period of nuclear fuel), thereby more accurately replicating axial power distributions of the nuclear reactor core throughout the overall period of the nuclear fuel.

First Claim
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
KEPCO NUCLEAR FUEL CO LTD | 242 DAEDEOK-DAERO 989BEON-GIL YUSEONG-GU DAEJEON 305-353 |
International Classification(s)

- [Classification Symbol]
- [Patents Count]
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Kim, Dong Soo | Daejeon, KR | 260 | 3434 |
Kim, Young Baek | Daejeon, KR | 10 | 30 |
Oh, Do Young | Daejeon, KR | 2 | 0 |
Park, Young Ho | Daejeon, KR | 127 | 1295 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 23, 2027 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events

Matter Detail

Renewals Detail

Note
The template below is formatted to ensure compatibility with our system.
Provide tags with | separated like (tags1|tags2).
Maximum length is 128 characters for Customer Application No
Mandatory Fields * - 'MatterType','AppType','Country','Title','SerialNo'.
Acceptable Date Format - 'MM/DD/YYYY'.
Acceptable Filing/App Types -
- Continuation/Divisional
- Original
- Paris Convention
- PCT National
- With Priority
- EP Validation
- Provisional Conversion
- Reissue
- Provisional
- Foreign Extension
Acceptable Status -
- Pending
- Abandoned
- Unfiled
- Expired
- Granted
Acceptable Matter Types -
- Patent
- Utility Model
- Supplemental Protection Certificate
- Design
- Inventor Certificate
- Plant
- Statutory Invention Reg
Advertisement
Advertisement
Advertisement

Recipient Email Address

Recipient Email Address

Comment
Recipient Email Address

Success
E-mail has been sent successfully.
Failure
Some error occured while sending email. Please check e-mail and try again!
PAIR load has been initiated
A preliminary load of cached data will be loaded soon. Current PAIR data will be loaded within twenty four hours.
File History PDF
Thank you for your purchase! The File Wrapper for Patent Number 20160180976 will be available within the next 24 hours.
Add to Portfolio(s)
To add this patent to one, or more, of your portfolios, simply click the add button.
This Patent is in these Portfolios:
Add to additional portfolios:

Last Refreshed On:
Changes done successfully
Important Notes on Latency of Status data
Please note there is up to 60 days of latency in this Status indicator for certain status conditions. You can obtain up-to-date Status indicator readings by ordering PAIR for the file.
An application with the status "Published" (which means it is pending) may be recently abandoned, but not yet updated to reflect its abandoned status. However, an application filed less than one year ago is unlikely to be abandoned.
A patent with the status "Granted" may be recently expired, but not yet updated to reflect its expired status. However, it is highly unlikely a patent less than 3.5 years old would be expired.
An application with the status "Abandoned" is almost always current, but there is a small chance it was recently revived and the status not yet updated.
Important Note on Priority Date data
This priority date is an estimated earliest priority date and is purely an estimation. This date should not be taken as legal conclusion. No representations are made as to the accuracy of the date listed. Please consult a legal professional before relying on this date.
We are sorry but your current selection exceeds the maximum number of portfolios (0) for this membership level. Upgrade to our Level for up to -1 portfolios!.