Process for additive manufacturing of parts by melting or sintering particles of powder(s) using a high-energy beam with powders adapted to the targeted process/material pair

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10710156
APP PUB NO 20160175929A1
SERIAL NO

14902699

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of fabricating parts out of metallic, intermetallic, ceramic, ceramic matrix composite, or metal matrix composite material with discontinuous reinforcement, includes melting or sintering powder particles by means of a high-energy beam. The powder used is a single powder of particles that present sphericity lying in the range 0.8 to 1.0 and of form factor lying in the range 1 to √2, each powder particle presenting substantially identical mean composition, and the grain size distribution of the particles of the powder is narrowed around the mean diameter value d50% in such a manner that: (d90%−d50%)/d50%≤0.66; and (d50%−d10%)/d50%≤0.33; with a “span”: (d90%−d10%)/d50%≤1.00.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAFRAN AIRCRAFT ENGINES; EUROPEAN AERONAUTIC DEFENCE AND SPACE COMPANY - EADS FRANCE; AIRBUS HELICOPTERS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colin, Christophe Evry, FR 18 271
Kirschner, Laetitia Paris, FR 1 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00