NAND flash reliability with rank modulation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9983808
SERIAL NO

14965869

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The reliability of NAND flash memory decreases rapidly as density increases, preventing the wide adoptions of flash-based storage systems. A novel data representation scheme named rank modulation (RM) is discussed for improving NAND flash reliability. RM encodes data using the relative orders of memory cell voltages, which is inherently resilient to asymmetric errors. For studying the effectiveness of RM in flash, RM is adapted to make it simple to implement with existing flash memories. The implementation is evaluated under different types of noise of 20 nm flash memory. Results show that RM offers significantly lower cell error rates compared to the current data representation in flash at typical P/E cycles. RM is applied to flash-based archival storage and shows that RM brings up to six times longer data retention time for 16 nm flash memory.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CALIFORNIA INSTITUTE OF TECHNOLOGY1200 E CALIFORNIA BLVD M/C 6-32 PASADENA CA 91125

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bruck, Jehoshua Pasadena, US 52 2517
En, Gad Eyal Pasadena, US 21 96
Jiang, Anxiao College Station, US 14 407
Li, Yue College Station, US 869 5176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00