METHOD FOR CONSTRUCTING WIND POWER CONNECTION SYSTEM MODEL BASED ON MEASURED DATA

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20160169205A1
SERIAL NO

14565445

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of constructing wind power connection system model based on measured data includes following steps. Operating data is selected in a preset time of each wind turbine in a wind farm. A wind speed matrix and a active power matrix of sampling points are constructed based the operating data. A wind speed model of the wind farm is obtained based on the wind speed matrix and the active power matrix.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STATE GRID CORPORATION OF CHINA100031 NO 86 WEST CHANG'AN AVENUE BEIJING XICHENG DISTRICT BEIJING CITY BEIJING CITY 100031
GANSU ELECTRIC POWER COMPANY OF STATE GRIDNO 8 BEIBINGHE EAST ROAD CHENGGUAN DISTINCT LANZHOU CITY GANSU PROVINCE PRC LANZHOU
WIND POWER TECHNOLOGY CENTER OF GANSU ELECTRIC POWER COMPANYNO 648 XIJIN EAST ROAD QILIHE DISTINCT LANZHOU CITY GANSU PROVINCE PRC LANZHOU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
DING, KUN Beijing, CN 22 48
HUANG, RONG Beijing, CN 47 289
LI, JIN Beijing, CN 561 11650
LIU, GUANG-TU Beijing, CN 7 9
LU, LIANG Beijing, CN 118 2257
LV, QING-QUAN Beijing, CN 11 13
MA, MING Beijing, CN 108 1515
WANG, DING-MEI Beijing, CN 10 24
WANG, NING-BO Beijing, CN 15 29
ZHANG, JIAN-MEI Beijing, CN 5 7
ZHANG, JIN-PING Beijing, CN 7 20
ZHAO, LONG Beijing, CN 81 123
ZHOU, QIANG Beijing, CN 211 655
ZHOU, SHI-YUAN Beijing, CN 8 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation