Secure control system for multistage thermo acoustic micro-CHP generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10156185
APP PUB NO 20160146153A1
SERIAL NO

14950945

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of controlling facility power requirements using a thermoacoustic power device is provided that includes determining energy assets in a facility, controlling the energy assets using an appropriately programmed controller across a network having a security system protocol, monitoring outside temperatures and weather, measuring usage of the energy assets using a temperature sensor or an electrical usage sensor to a load-response signal of an on/off operation and usage of the energy assets to identify a specific energy asset by the controller to determine aggregate energy needs of the energy assets, and using a thermoacoustic power device controlled by the controller to generate electricity and heat according to the monitored temperature, weather and energy assets.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIRVANA ENERGY SYSTEMS INC3130 ALPINE ROAD STE 288 PMB 601 PORTOLA VALLEY CA 94028

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Batra, Rajesh Los Altos, US 3 13
Bruder, Geoffrey A Parma Heights, US 10 15
Dyson,, Jr Rodger W Elyria, US 5 21
Hesselink, Lambertus Atherton, US 85 4787
Pickens, Mark A Brunswick, US 1 10
Troy, Neil W Santa Clara, US 1 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 18, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 18, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00