Screen device comprising screen rollers for preventing oversize grain from jamming

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9731326
SERIAL NO

14933418

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A screen device for sorting screening material into one or more fine grain fractions and one or more oversize grain fractions. The screen device includes a frame and a roller screen including screen rollers which are arranged, such that they can be rotary-driven about a roller axis each, next to each other and which are supported on the frame and which each comprise a roller body and one or more screen structures which protrude radially relative to the roller body. There is a fine grain screen gap between the roller bodies of respectively adjacent screen rollers, through which a fine grain fraction falls, while an oversize grain fraction is conveyed on the roller screen in the axial direction of the rollers when the screen rollers are rotary-driven. The roller body of at least one of the screen rollers widens radially in the axial direction of the rollers in an axial widening portion and the width of the fine grain screen gap which the widening roller body forms with the roller body of an adjacent screen roller decreases in the axial direction of the rollers along the widening portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GÜNTHER HOLDING GMBH & CO KGIM TIEGEL 7 WARTENBERG 36367

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Günther, Bernhard Wartenberg, DE 43 838

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00