Device for producing a component from fiber composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10647067
APP PUB NO 20160121562A1
SERIAL NO

14895664

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a device for producing a component made from a fiber composite material from a semi-finished fibrous product by means of a multi-part molding and infiltration tool with tool parts, the molding functional surfaces thereof forming, when the tool is closed, a cavity that defines the component. The device is characterized in that the tool (1) has a sealing frame (2, 16, 18, 20, 21, 22) which is designed as a hollow body and in which the semi-finished fibrous product (3) can be arranged, and the tool parts (4) are configured and can be associated with the sealing frame (2, 16, 18, 20, 21, 22) such that, when the tool (1) is closed, the tool parts (4) are connected tightly to the sealing frame (2, 16, 18, 20, 21, 22).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THYSSENKRUPP CARBON COMPONENTS GMBHFRANKENRING 1 KESSELSDORF DE-01723

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bartsch, Andre Dresden, DE 8 19
Dressler, Michael Dresden, DE 24 80
Koehler, Christian Dresden, DE 47 341
Maeke, Sandro Dohma, DE 9 31
Werner, Jens Coswig, DE 61 298

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 12, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 12, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00