Hydrogenation and disproportionation catalysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9770710
APP PUB NO 20160121318A1
SERIAL NO

14769314

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Improved catalytic methods are disclosed. The methods include both hydrogenation and disproportionation catalysis. While the reaction conditions for hydrogenation and disproportionation differ, the catalysts disclosed herein can be used for either process. In certain aspects, the methods utilize a catalyst: CpM(N—N)Ln; wherein Cp is a substituted or unsubstituted cyclopentadienyl ligand; wherein M is selected from the group consisting of Ir and Rh; wherein N—N is a substituted or unsubstituted bidentate ligand selected from the group consisting of a bipyridine ligand and a phenanthroline ligand; wherein n is 0 or 1; and wherein when n is 1 L is selected from the group consisting of an anion and a molecule of a solvent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF WASHINGTON THROUGH ITS CENTER FOR COMMERCIALIZATION4545 ROOSEVELT WAY NE SUITE 400 SEATTLE WA 98105

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brewster, Timothy P Seattle, US 1 1
Goldberg, Karen I Seattle, US 3 4
Heinekey, D Michael Seattle, US 2 4
Mayer, James M Seattle, US 9 85
Miller, Alexander J M Seattle, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00