Variable displacement lubricant pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10024207
SERIAL NO

14893529

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lubricant pump comprises a shiftable control ring, a pump rotor rotating in the control ring, a pump outlet, and a pressure control system. The pressure control system comprises a pressure control chamber which pushes the control ring into a high pumping volume direction, an engine pressure input port connected to an engine pressure output port of an engine, a pilot chamber connected to the engine pressure input port which pushes the control ring into a low pumping volume direction, and a pressure control valve which controls a pressure in the pressure control chamber. The pressure control valve comprises a control valve plunger which opens/closes a control port to connect/disconnect the pressure control chamber to the atmospheric. The control valve plunger is fluidically connected to the engine pressure input port so that the control valve plunger is pushed by a lubricant pressure of the engine into an open position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PIERBURG PUMP TECHNOLOGY GMBHALFRED-PIERBURG-STRASSE 1 NEUSS 41460

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Celata, Nicola Leghorn, IT 3 11
Malotti, Andrea Cecina, IT 1 6
Moriglia, Maurizio Mondovi, IT 3 11
Novi, Nicola Pisa, IT 5 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00