Sensor power management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10823581
APP PUB NO 20160109261A1
SERIAL NO

14981894

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sensor power management arrangement includes a signal processing circuit configured to receive signal from a sensor, to test the signal against at least one criterion, and to pass the signal for further processing in response to the signal passing the at least one criterion. In this way, only signals that are of a sufficient importance or significance will consume the maximum amount of processing energy and through processing by later processes or circuitry. Should a signal from a sensor not be strong enough or meet other criteria, power will not be wasted in preparing that signal for provision to the microcontroller or microprocessor. Additional flexibility in the sensor power management can be realized by adjusting the criteria against which the sensor signal is compared based on a status of the sensor apparatus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATEDDALLAS TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corsi, Marco Parker, US 112 2648
Freeman, David Louis McKinney, US 8 214
Narayanan, Sriram Richardson, US 29 270

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00