Method for manufacturing a composite material made ornament

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9975286
SERIAL NO

14515207

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a composite material made ornament by using a mould assembly only involves: positioning of the fastener in the first mould, positioning of the composite material layers in the second mould, and then closing the mould assembly, injecting glue and drying, then obtaining a composite material made ornament. The glue injecting process enables the glue to be fully penetrated into the composite material layers to connect the composite material layer and the fastener, and to form the connecting portion at the same time, which not only improves the manufacturing efficiency, but also enhances the structure strength and quality of the product of the present invention. Furthermore, the composite material made ornament is fixed to the fixing member by the fastener, without the problem that the glue is likely to be aged or degraded, causing peeling off of the carbon fiber composite.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ONG CHING LONGNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ong, Ching-Long Taichung, TW 9 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 22, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 22, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00