Method and system to conduct a bonus game that links separate primary lottery games

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10099114
APP PUB NO 20160101352A1
SERIAL NO

14880574

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and related methods for conducting a bonus game to a first primary game that enhances sales of tickets in an unrelated second primary game includes establishing the first primary game wherein players are issued first game tickets for play of the first primary game. A bonus game is established that is played separate from the first primary game. To qualify for entry into the bonus game, players enter at least one first game ticket from the first primary game. A second primary game is established wherein players are issued second game tickets that are linked to the bonus game for the first primary game such that players enhance the prize awarded in the bonus game by entering the second game tickets into the bonus game. Play of the first primary game does not require play of the bonus game or the second primary game. Play of the second primary game does not require play of the first primary game or the bonus game. Play of the bonus game requires play of the first primary game but not the second primary game.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCIENTIFIC GAMES LLC1500 BLUEGRASS LAKES PARKWAY ALPHARETTA GA 30004

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marinelli, Victor Canton, US 6 90
Rogers, Kyle Cumming, US 10 30
Saferin, Steve Atlanta, US 5 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 16, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 16, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00