Apparatus for supplying power to a field device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10110279
APP PUB NO 20160099754A1
SERIAL NO

14508060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatus for supplying power to a field device, comprising: a first electrical connector adapted to electrically couple a field device to the apparatus, a power supply unit electrically coupled to the first connector and adapted to provide electrical power to a field device via the first connector; a local user input, e.g. a manually operated switch, adapted to be actuated by a user; a monitoring circuitry electrically coupled to the local user input and adapted to detect an actuation of the local user input. The monitoring circuit is adapted to generate an activation signal causing the power supply unit to provide electrical voltage to the first electrical connector for powering a field device electrically coupled to the first connector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENDRESS + HAUSER PROCESS SOLUTIONS AG4153 REINACH BL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fiedler, Marc Reinach, CH 22 92
Griech, Reinhard Weil am Rhein, DE 6 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 23, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 23, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00