Superheated steam generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10352554
APP PUB NO 20160097529A1
SERIAL NO

14875604

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention intends to suppress energy consumption while making it possible to generate superheated steam in a short period of time. Specifically, the present invention includes: a steam generating part that generates steam; a superheated steam generating part that generates superheated steam; an on/off valve that switches between supplying the steam to the superheated steam generating part or stopping the supply; and a control device that sends a control signal to the switching mechanism for switching between a waiting state in which the steam generating part generates the steam and the supply of the steam is stopped, and a supply state in which the steam is supplied to the superheated steam generating part. When switching from the waiting state to the supply state, the control device gradually increases an amount of the steam supplied to the superheated steam generating part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKUDEN CO LTDKYOTO-SHI KYOTO 607-8345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimoto, Yasuhiro Kyoto, JP 43 143
Kimura, Masayoshi Otsu, JP 19 137
Tonomura, Toru Otsu, JP 31 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00