Confirming data accuracy in a distributed control system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10673565
APP PUB NO 20160094312A1
SERIAL NO

14870538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control network communication arrangement includes a second protocol embedded into a first protocol in a way that modules supporting the second protocol may be aware of and utilize the first protocol whereas modules supporting only the first protocol may not be aware of the second protocol. Operation of modules using the second protocol does not disturb operation of the modules not configured to use or understand the second protocol. By one approach, unique additional information is embedded into an end of frame portion of a message to confirm that the portion is the end of frame portion. This acts as a quality check confirming proper synchronization and decoding of the signaling on the communication bus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KVASER AB43153 MÖLNDAL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fredriksson, Lars-Berno Kinna, SE 11 36
Lennartsson, Kent Åke Lennart Fotskäl, SE 5 38
Olsson, Jonas Henning Molnlycke, SE 8 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00