Debugging system and debugging method of multi-core processor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9852038
SERIAL NO

14563317

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a debugging system and a debugging method of a multi-core processor. The debugging system includes a debugging host, a target processor, and a mapping and protocol conversion device. The debugging host includes a debugger, and the target processor includes a plurality of cores. The mapping and protocol conversion device is connected between the debugging host and the target processor, identifies a core architecture to which each of the cores belongs, and maps each of the cores respectively to at least one thread of at least one process according to the core architecture to which each of the cores belongs. Afterwards, the debugger executes a debugging procedure on the target processor according to the process and the thread corresponded to each of the cores.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALI (CHENGDU) CORPORATION2702 UNIT 3 BUILDING 1 NO 333 JIQING THIRD ROAD CHENGDU HIGH TECH ZONE CHINA (SICHUAN) PILOT FREE TRADE ZONE CHENGDU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kang, Yu-Feng Guangdong, CN 1 3
Wang, Qian-Zhi Guangdong, CN 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00