Connector having a conductive casing with an inclined plane parallel to a section of a terminal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9350099
APP PUB NO 20160079693A1
SERIAL NO

14814523

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connector including a conductive casing, a terminal, a first insulation structure and a conductive structure is provided. The conductive casing has an inner wall. The terminal includes a first section and a second section. The first section is disposed in the conductive casing, and the first section and the inner wall have a gap therebetween. The second section is located outside the conductive casing. The first insulation structure is disposed between the first section and the inner wall. The conductive structure is electrically connected to the conductive casing and has an inclined plane. The inclined plane is aligned to the second section, the second section and the inclined plane have a gap therebetween, and the inclined plane is parallel to a extending direction of the second section. In addition, a printed circuit board module having the connector is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WISTRON NEWEB CORPHSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Cheng-Hsiung Hsinchu, TW 10 19
Wu, Huei-Chi Hsinchu, TW 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00