Bidirectional conversion architecture with energy storage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9787101
SERIAL NO

14480820

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrical system for an aircraft with an electric taxi system (ETS), the electrical system may include at least one traction motor, a DC link and at least one traction-motor bidirectional DC-AC converter interposed between the at least one traction motor and the DC link. An engine-driven power source may be configured to provide DC power to the DC link or extract DC power from the DC link. A battery unit may be configured to provide DC power to the DC link or extract DC power from the DC link. An adaptive power controller may be interconnected with the power source, the battery unit and the at least one traction-motor bidirectional DC-AC converter and configured to regulate voltage of DC power delivered to the DC link.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONEYWELL INTERNATIONAL INCINTELLECTUAL PROPERTY SERVICES GROUP 855 S MINT STREET CHARLOTTE NC 28202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anghel, Cristian Oro Valley, US 33 336
DiVito, Rocco Ontario, CA 10 217
Kojori, Hassan Ali Ontario, CA 24 605
Morcov, Nicolae Ontario, CA 6 98
Pearson, Wayne Oro Valley, US 17 257

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00