Tempered SCR-line and tempered SCR-line bundles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9920673
SERIAL NO

14567240

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an SCR line for treatment of exhaust from an internal combustion engine and including a first hose to carry a reducing agent, a second hose to carry a tempering agent and a pipe enclosing the two hoses. The two hoses are arranged in the pipe so as to run side by side in parallel. Each of the same-side ends of the first hose and of the pipe are connected to a reducing agent coupling housing. The ends of the second hose are each connected to a tempering agent coupling part separate from the reducing agent coupling housing. At least one of the reducing agent coupling housings has a through-opening at the outer perimeter. The second hose runs from the interior of the pipe through the through-opening to the outside. Furthermore, the invention relates to an SCR line bundle with an SCR line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOSS AUTOMOTIVE GMBH51688 WIPPERFÜRTH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becht, Andreas Freisbach, DE 2 8
Bohl, Alexander Wuppertal, DE 2 5
Kaltwasser, Klaus Köln, DE 1 2
Rosenfeldt, Sascha Wipperfürth, DE 19 178

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00