Scalable three-dimensional elastic construct manufacturing
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Nov 24, 2020
Grant Date -
Mar 10, 2016
app pub date -
Dec 10, 2013
filing date -
Dec 10, 2012
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Tissue repair and restoration can be performed using an elastic material formed from tropoelastin. The elastic material can be formed by providing a solution of tropoelastin monomers, applying the solution to a surface, and heating the solution on the surface in absence of a cross-linking agent to enable the tropoelastin monomers to bind to each other to form an elastic material that does not dissociate into tropoelastin monomers when the elastic material is contacted with an aqueous solution.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ALLERGAN AUSTRALIA PTY LTD | 810 PACIFIC HIGHWAY LEVEL 4 GORDON NEW SOUTH WALES 2072 |
International Classification(s)

- 2013 Application Filing Year
- A61K Class
- 12711 Applications Filed
- 11051 Patents Issued To-Date
- 86.95 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Mithieux, Suzanne Marie | Sydney, AU | 17 | 18 |
# of filed Patents : 17 Total Citations : 18 | |||
Weiss, Anthony Steven | Sydney, AU | 31 | 101 |
# of filed Patents : 31 Total Citations : 101 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- A61K Class
- 0 % this patent is cited more than
- 5 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | May 24, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | May 24, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
