ARRANGEMENT AND CONSTRUCTION FOR AIRFRAME WIRES
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Feb 25, 2016
app pub date -
Aug 19, 2014
filing date -
Aug 19, 2014
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
An airframe wire is provided having a conductor and a first inner layer of polyimide insulation which is a helically applied tape including a polyimide component. A second outer layer of fluoropolymer insulation is a helically applied tape made from PTFE, where the second outer PTFE layer of fluoropolymer insulation is constructed as a substantially seamless outer layer so as to provide a hydrostatic barrier for the underlying inner first layer.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
NEXANS | 8 RUE DU GENERAL FOY PARIS 75008 |
International Classification(s)

- 2014 Application Filing Year
- H01B Class
- 1335 Applications Filed
- 1040 Patents Issued To-Date
- 77.91 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Getzie, Travis | Lancaster, US | 2 | 1 |
# of filed Patents : 2 Total Citations : 1 | |||
Ide, James | Clayton, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
Jolly, Michael W | Raleigh, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H01B Class
- 0 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 25, 2027 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
