Apparatus and method for controlling spool displacement of construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10670050
APP PUB NO 20160053778A1
SERIAL NO

14781495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are an apparatus and a method for controlling spool displacement of a construction machine, which are capable of improving regeneration efficiency of the construction machine, and improving a fuel efficiency characteristic of the construction machine by reducing pressure loss in the operating mode by adjusting the quantity of spool displacement in a regeneration mode when a current pressure of a main pump is less than a predetermined operating pressure, and determining whether the construction machine is in an operating mode or the regeneration mode in real time according to an operating angle of a joystick and the current pressure of the main pump when the current pressure of the main pump is greater than or equal to the predetermined operating pressure to variably change the quantity of spool displacement in the operating mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HD HYUNDAI INFRACORE CO LTD489 INJUNG-RO DONG-GU INCHEON 22502

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Ki Yong Seoul, KR 37 91

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 2, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00