DUAL OUTLET BURNER AND METHOD
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Aug 14, 2015
filing date -
Aug 15, 2014
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A burner includes a casing that encloses an outer plenum, the casing forming a fuel inlet and an outer nozzle at its end. An inner tube extends generally concentrically through the outer plenum and forms an inner plenum such that the casing encloses the outer plenum and the inner plenum. The inner tube forms an inner nozzle at its end. The inner nozzle is disposed generally concentrically with respect to the outer nozzle. A valve arrangement adjusts a fuel velocity separately through each of the outer nozzle and the inner nozzle to shape a flame created when the fuel is provided in an oxidant rich environment.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ECLIPSE INC | 1665 ELMWOOD ROAD ROCKFORD IL 61103 |
International Classification(s)

- 2015 Application Filing Year
- F23N Class
- 105 Applications Filed
- 78 Patents Issued To-Date
- 74.29 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Anderson, Scott | Orlando, US | 117 | 1521 |
# of filed Patents : 117 Total Citations : 1521 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 1 Citation Count
- F23N Class
- 11.32 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 18, 2027 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
