Ultra-high performance glass concrete and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9856171
APP PUB NO 20160039716A1
SERIAL NO

14780276

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a Ultra-high performance glass concrete (UHPGC) including between 300 and 1000 kg/m3 of cement, between 0 and 1400 kg/m3 of glass sand (GS), between 0 and 300 kg/m3 of reactive pozzolanic material, between 150 and 900 kg/m3 of glass powder (GP), between 0 and 600 kg/m3 of fine glass powder (FGP), between 5 and 60 kg/m3 of superplasticizer, between 50 and 300 kg/m3 of fiber; and, between 130 and 275 kg/m3 of water, wherein the content of GP is of at least 3 wt % of the UHPGC, and/or the content of GS is of at least 19 wt % of the UHPGC and/or the content of FGP is of at least 0.5 wt % of the UHPGC.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITE DE SHERBROOKESHERBROOKE QUÉBEC J1K 2R1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Soliman, Nancy Sherbrooke, CA 1 3
Tagnit-Hamou, Arezki Sherbrooke, CA 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00