POLYMERIC COMPOSITIONS FOR DOWNHOLE APPLICATIONS
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Feb 4, 2016
app pub date -
Apr 2, 2014
filing date -
Apr 5, 2013
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
Methods for treating a wellbore and compositions used for same are provided that include emplacing a polymer-forming composition in the wellbore, and initiating polymerization of the polymer-forming composition to form a polymerized material in the selected region of the wellbore. In some aspects, polymeric compositions provided may also be useful for isolating pressure differentials downhole.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
M-I L L C | 1201 LOUISIANA STREET HOUSTON TX 70002 |
International Classification(s)

- 2014 Application Filing Year
- C09K Class
- 2473 Applications Filed
- 1988 Patents Issued To-Date
- 80.39 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Chew, Andrew | Houston, US | 2 | 24 |
# of filed Patents : 2 Total Citations : 24 | |||
De, Stefano Guido | Houston, US | 13 | 54 |
# of filed Patents : 13 Total Citations : 54 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 12 Citation Count
- C09K Class
- 83.30 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Aug 4, 2027 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
