WATER TURBINE
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jan 28, 2016
app pub date -
Jul 21, 2015
filing date -
Jul 24, 2014
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A water turbine, such as a pump turbine, includes an impeller and a guide wheel that are adjustable. By adjusting the angles of the impeller blades or the guide vanes, such as beyond a range of 180 degrees and 90 degrees, respectively, the water turbine may be adjusted to switch between power generation and pumping, and for tidal flow.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
ANDRITZ HYDRO GMBH | EIBESBRUNNERGASSE 20 WIEN 1120 |
International Classification(s)

- 2015 Application Filing Year
- F03B Class
- 248 Applications Filed
- 174 Patents Issued To-Date
- 70.17 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
KONTOLEONTOS, Evgenia | Linz, AT | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
KRAGL, Markus | Linz, AT | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
MICHELCIC, Josef | Perg, AT | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
OBERBICHLER, Erwin | St. Martin, AT | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
WEISSENBERGER, Simon | Ottensheim, AT | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F03B Class
- 0 % this patent is cited more than
- 9 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 28, 2027 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
