Angled degradation pick

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9909417
SERIAL NO

14707475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A degradation pick of the type used in such fields as road milling, mining, and trenching to engage and degrade tough materials such as asphalt, concrete, and rock may comprise a body attached at one end to a substantially cylindrical shaft. A hardened tip may also be attached to the body opposite the shaft. The hardened tip may comprise an axis offset from a central axis of the shaft. Such a degradation pick may be secured to an exterior of a rotatable drum or continuous chain so as to be repeatedly brought into contact with a surface of a material to be degraded. The body may comprise a protruding spine adjacent the hardened tip and opposite a direction of travel of the hardened tip when transported by a rotating drum or continuous chain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NOVATEK IP LLC2185 TRACY HALL PARKWAY PROVO UT 84606

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Condon, Gary Canonsburg, US 1 10
Crockett, Jeffrey Spanish Fork, US 1 10
Crockett, Ronald B Spring City, US 91 2218
Hall, David R Provo, US 1292 20766
Norris, Dwain Spanish Fork, US 8 20
Peterson, Gary Salem, US 35 577

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00