Ballistic resistant article and process to manufacture said article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9869534
SERIAL NO

14767371

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ballistic resistant article is provided along with a process to manufacture the article. The ballistic resistant articles includes at least one consolidated composite, wherein the at least one consolidated composite includes at least two layers, each layer includes a network of fibers, the fibers have a strength of at least 800 mN/tex (1100 MPa) according to ASTM D 7269-07, the fibers in each layer are impregnated with a matrix material, and each consolidated composite has a front surface and a rear surface. In the ballistic article, at least the front surface of each consolidated composite is powder coated with partly molten and solidified powder particles to form a powder coated surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BARRDAY INC75 MOOREFIELD STREET CAMBRIDGE N1R 5W6
TEIJIN ARAMID B VTIVOLILAAN 50 ARNHEM 6824 BW

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Haas Marc-Jan Apeldoorn, NL 14 44
Poulopoulos, Nektarios Petersburg, CA 2 1
Van, Bommel Vincent Zevenaar, NL 3 6
Van, Norel Alex Duiven, NL 4 9
Williams, Alicia Huntersville, US 6 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00