Composite stretch material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9731316
APP PUB NO 20160008839A1
SERIAL NO

14864806

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nozzle assembly includes an upstream block, an upstream shim, an intermediate shim, a downstream shim and a downstream block arranged in this order in a machine direction MD from the upstream side to the downstream side. A lower end of the nozzle is formed with grooves as guide grooves to support elastics. A first pipe, a dispersion slit for a web and convergence slits for a web define first flow channels wherein the slits are respectively formed with outlets for a web. A second pipe, a dispersion slit for elastics and convergence slits for elastics define a second flow channels wherein the slits are respectively formed with outlets for elastics. The outlets for elastics are formed in the respective guide grooves and each of the outlets for a web lies between each pair of the adjacent outlets for elastics as viewed in the cross direction CD.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNICHARM CORPORATION182 SHIMOBUN KINSEI-CHO SHIKOKUCHUO-CITY EHIME 7990111 ?7990111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ukegawa, Kazuo Kanonji, JP 21 245

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 15, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 15, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00