Device for producing plastic pipes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10773442
APP PUB NO 20160001484A1
SERIAL NO

14769459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device produces plastic pipes by extrusion, involving an extruder, a pipe head connecting to the extruder in production direction, having a base material, mandrel, and sheath. A melt channel, formed between the mandrel and sheath in production direction, promotes flow at least at the mandrel and sheath end, the mandrel and sheath being adjustable forwards and backwards relative to one another, and the outer mandrel surface and/or the inner sheath surface at least partially having a material with greater sliding capacity than the base material. Mandrel diameter at the end conically widens or narrows, and/or the mandrel end is curved so the diameter widens, narrows, or remains constant, and the inner sheath diameter at the end conically widens, narrows, or remains constant, and/or the sheath end is curved so the diameter widens or narrows, or two further surface sections, parallel and cylindrical, extend at the mandrel and sheath end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BATTENFELD-CINCINNATI GERMANY GMBHGERMANY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dohmann, Heinrich Hoexter, DE 17 15
Stieglitz, Henning Minden, DE 8 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00