Ground structure for motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9853406
SERIAL NO

14772382

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ground structure for a motor including: a housing having a flange protruded upwardly from the outer periphery of an opening formed on the top surface thereof; a bearing cover having a coupling groove formed along the outer periphery of the underside thereof to inserted the flange of the housing thereinto; a stator core fixedly disposed to the inside of the housing and having a plurality of teeth on which a coil is wound formed annularly along the inner periphery thereof; and a connector having one end coupled to the flange of the housing in such a manner as to be brought into contact with the coupling groove of the bearing cover when the bearing cover is coupled to the top end periphery of the housing and the other end passed through the housing in such a manner as to be brought into contact with the stator core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOCOCO INC75 ARLINGTON STREET SUITE 500 BOSTON MA 02116

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jang, Jeong Cheol Gwangju, KR 83 319
Jeong, Wang gyu Gwangju, KR 13 47
Kim, Byung soo Gwangju, KR 139 1246

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00