Method for constructing optimal time-controlled paths in a large computer network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9860191
SERIAL NO

14410503

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the invention relate to the dynamic creation of TT paths in a large computer network having computer nodes, communication channels, and distribution modules (DMs), which all have access to a global time base, wherein a scheduling instance, aimed at establishing a time-controlled path with specified path time characteristics from a transmitting to a receiving node along an existing virtual connection (VC), requests from each DM in the VC all the TT path descriptor lists (TTPDLs) confirmed by said DMs, then transmits the specified path time characteristics and all confirmed TTPDLs to a dynamic scheduler that creates a new TTPDL for each DM in the VC, the existing reserved TTPDLs of the DMs affected remaining unchanged, wherein the corresponding new TTPDLs are transmitted to each DM in the VC, and wherein each DM in the VC reserves the TT path requested and confirms the reservation to the scheduling instance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TTTECH INDUSTRIAL AUTOMATION AG1040 WIEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kopetz, Hermann Baden, AT 47 312

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00