Automatic regeneration control device for particulate filter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850793
SERIAL NO

14655093

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An automatic regeneration controller for a particular filter comprises an engine controller, a unit controller, and a load application cancellation switch. With filter regeneration being started by determination of particulate accumulation and with an idling or light-load operation being conducted, load request to a work unit is outputted from the engine controller to the unit controller. Then, when load application is not possible or the load application cancellation switch is on and, in addition, exhaust temperature is not maintainable with no load application, a regeneration stop signal is outputted from the unit controller to the engine controller and a regeneration stop signal reception process is conducted in the engine controller, and with no forced load application to a hydraulic unit, fuel addition is stopped to stop automatic regeneration control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HINO MOTORS LTD1-1 HINODAI 3-CHOME HINO-SHI TOKYO 191-8660

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hironaka, Masaru Tokyo, JP 1 1
Miyoshi, Kenji Tokyo, JP 1 1
Roppongi, Akihito Tokyo, JP 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00