Linkage between an auxiliary motion source and a main motion load path in an internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10626763
SERIAL NO

14735247

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an internal combustion engine, a linkage is provided between an auxiliary motion source and a main motion load path, such that motions received by the linkage from the auxiliary motion source result in provision of a first force to at least one engine valve and a second force to the main motion load path in a direction toward a main motion source. Where an automatic lash adjuster is associated with the main motion load path, the second force may be selected to aid in the control of lash adjustments made by the automatic lash adjuster. In various embodiments, the linkage may be embodied in an mechanical linkage, whereas in other embodiments, an hydraulic linkage may be employed. The linkage may be incorporated into, or otherwise cooperate, a valve bridge or a rocker arm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JACOBS VEHICLE SYSTEMS INC22 EAST DUDLEY TOWN ROAD BLOOMFIELD CT 06002

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baltrucki, Justin Canton, US 12 117
Ferreira, David Glastonbury, US 10 59
Jo, Peter Rocky Hill, US 3 24
Wamane, Neenad Bloomfield, US 2 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 21, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 21, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00