Coal fired oxy plant with air separation unit including parallel coupled heat exchanger

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10006634
SERIAL NO

14707744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A coal fired Oxy boiler power plant having a combustion system configured to burn coal using an oxygen stream to produce a flue gas stream, a CO2 capture system connected to the flue gas stream and a steam cycle with serially arranged low pressure heaters forming part of a condensate system. The combustion system includes, an Air Separation Unit for removing N2 from air to produce the oxygen stream for the boiler. The Air Separation Unit includes an Air Separation Unit heat exchanger that is thermally and fluidly connected to the condensate system so as to be fluidly parallel to at least one serial low pressure heater and fluidly parallel to at least one less that the total number of serial low pressure heaters. The Flue Gas Heat Recovery System, Flue Gas Condenser and Gas Processing unit are thermally integrated into the condensate system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC TECHNOLOGY GMBHSWISS BADEN BADEN AARGAU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geiger, Frederic Giromagny, FR 10 21
Granier, Francois Vetrigne, FR 6 34
Pourchot, Thierry Naves Parmelan, FR 8 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00