Communication over generator bus
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Apr 30, 2019
Grant Date -
Oct 29, 2015
app pub date -
Apr 25, 2014
filing date -
Apr 25, 2014
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A generator system includes at least one generator, at least one generator controller, and a power bus. The power bus transmits power to a load circuit. Data communications are also transmitted by the power bus. In one example, multiple generator controllers exchange messages over the power bus. In another example, one or more generator controllers exchange messages with a central controller over the power bus. The messages may include a status for the generators, output values for the generators, or commands for the generators.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DISCOVERY ENERGY LLC | 220 TWIN OAKS DRIVE KOHLER WI 53044 |
International Classification(s)

- 2014 Application Filing Year
- H03L Class
- 712 Applications Filed
- 648 Patents Issued To-Date
- 91.02 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Frampton, Isaac S | Strattanville, US | 88 | 613 |
# of filed Patents : 88 Total Citations : 613 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H03L Class
- 0 % this patent is cited more than
- 6 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Oct 30, 2026 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Oct 30, 2030 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
