Power supply device, and control method of power supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9843227
SERIAL NO

14690381

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply device according to an embodiment comprises a plurality of power sources 10 each including an antenna and an AC/DC conversion unit, a plurality of consolidating units 13_1 to 13_i, and a power supply unit 15. The consolidating units 13_1 to 13_i respectively include consolidating circuits 14_1 to 14_i that selectively consolidate a plurality of DC signals 21_1 to 21_n supplied by the plurality of power sources 10. The power supply unit 15 includes a consolidating circuit 16 that selectively consolidates the DC signals 21_1 to 21_i output from the plurality of consolidating units 13_1 to 13_i, and a voltage conversion circuit 17 that converts a DC signal 23 resulting from consolidation in the consolidating circuit 16, to a predetermined voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATION2-24 TOYOSU 3-CHOME KOTO-KU TOKYO 135-0061

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikenaga, Yoshifumi Kawasaki, JP 23 121
Noguchi, Koichiro Kawasaki, JP 22 69
Nose, Koichi Kawasaki, JP 64 312
Yoshida, Yoichi Kawasaki, JP 46 1118

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00