BiCMOS integration using a shared SiGe layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10297591
APP PUB NO 20150303187A1
SERIAL NO

14659974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bipolar complementary-metal-oxide-semiconductor (BiCMOS) device is disclosed. The BiCMOS device includes a CMOS device in a CMOS region, a PNP bipolar device in a bipolar region, and an NPN bipolar device in the bipolar region. The BiCMOS device includes also includes a silicon-germanium (SiGe) layer over a base of the PNP bipolar device and over a selectively implanted collector of the NPN bipolar device, wherein a first portion of the SiGe layer forms a base of the NPN bipolar device, and a second portion of the SiGe layer forms an emitter of the PNP bipolar device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEWPORT FAB LLC DBA JAZZ SEMICONDUCTOR4321 JAMBOREE ROAD NEWPORT BEACH CA 92660

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Preisler, Edward San Clemente, US 41 82
Thibeault, Todd Irvine, US 7 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00