Multi-stage vacuum ejector with molded nozzle having integral valve elements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10767662
APP PUB NO 20150300377A1
SERIAL NO

14648205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-stage ejector for generating a vacuum from a source of compressed air or fluid by passing the compressed air or fluid through a series of nozzles, accelerating and entraining the compressed air or fluid so as to form a jet flow in one or more stages and generate a vacuum across each stage. The multi-stage ejector may include a first drive stage; a second stage; and a converging-diverging nozzle provided in the series of nozzles between the first drive stage and the second stage. The multi-stage ejector, in use, may receive jet flow from the first drive stage, accelerate the jet flow to form a second stage air jet and direct the second stage air jet into an inlet of an outlet nozzle of the second stage. The converging-diverging nozzle may be formed in a molded nozzle piece mounted in the multi-stage ejector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PIAB AKTIEBOLAGBOX 4501 TABY SE-183 04

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tell, Peter Akersberga, SE 27 309

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00