External bed type double-fluidized bed system for preventing boiler contamination

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9784445
SERIAL NO

14646457

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An external bed type double-fluidized bed system for preventing boiler contamination includes a fluidized bed combustion furnace, a cyclone separator, a coal ash distributor and a fluidized bed pyrolysis furnace. The fluidized bed combustion furnace is connected with the coal ash distributor, the coal ash distributor is connected with the coal ash inlet on a side wall of the fluidized bed combustion furnace through a return feeder with which the coal ash outlet of the fluidized bed pyrolysis furnace is also connected through an external bed, and the return feeder is connected with the fluidized bed combustion furnace. A fuel coal is pyrolyzed in the fluidized bed pyrolysis furnace at a temperature to volatize alkali chlorides into a pyrolysis gas, thereby reducing the content of the alkali chlorides contained in the coal in the fluidized bed combustion furnace and relieving the contamination to a convective heat-absorbing surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DONGFANG ELECTRIC CORPORATIONJINNIU DISTRICT CHENGDU CITY SICHUAN PROVINCE 610000 SHU ROAD NO 333 CHENGDU CITY SICHUAN PROVINCE 610000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Liyong Chengdu, CN 5 6
Du, Qi Chengdu, CN 4 2
Fan, Wei Chengdu, CN 235 3308
Guo, Pan Chengdu, CN 24 27
Hu, Hongwei Chengdu, CN 28 64
Li, Yang Chengdu, CN 1182 7549
Liu, Jiang Chengdu, CN 116 702
Liu, Zhengning Chengdu, CN 3 2
Zhang, Chunfei Chengdu, CN 7 41
Zhang, Xin Chengdu, CN 895 4200
Zhang, Yuan Chengdu, CN 316 2644

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 10, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 10, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00