Ni-based single crystal superalloy and turbine blade incorporating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9499886
APP PUB NO 20150292063A1
SERIAL NO

14743833

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Ni-based single crystal superalloy which has the following composition: Co: 4.0 to 9.5 wt %, Cr: 5.1 to 8.0 wt %, Mo: 2.1 to 3.5 wt %, W: 0.0 to 2.9 wt %, Ta: 4.0 to 10.0 wt %, Al: 4.5 to 6.5 wt %, Ti: 0.0 to 1.0 wt %, Hf: 0.08 to 0.5 wt %, Nb: 0.0 to 3.0 wt %, Re: 4.5 to 8.0 wt % and Ru: 0.5 to 6.5 wt % with the remainder including Ni and unavoidable impurities, wherein P1≦700 is satisfied in which P1 represents a parameter 1, which is obtained by a formula: P1=137×[W (wt %)]+24×[Cr (wt %)]+46×[Mo (wt %)]−18×[Re (wt %)].

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IHI CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Yasuhiro Tokyo, JP 111 834
Arai, Mikiya Tokyo, JP 15 113
Chikugo, Kazuyoshi Kawasaki, JP 14 69
Masaki, Shoju Tokyo, JP 10 76
Sato, Akihiro Yokohama, JP 210 2699
Sekine, Nobuhito Tokorozawa, JP 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 22, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00